Basic Info.
After-sales Service
8s Service
Type
Induction Heating Machine
Structure
Horizontal Type
Product Description
Coal Burner Pulverized Combustion DeviceProduct Description
RM series coal burning system is special equipment that can supply heat source for the drying drum of asphalt mixing plant. We collect the advantage of dozens of similar products from home and overseas, and we researching, developing and producing independently. It can be used heating sand, building stones, and can also be used heating furnace, stove, etc. It achieves international advanced technology level. It adapts to supply heat sources with thermal equipment for all kinds of road machinery.
Application: Our coal-fired coal burners are mainly used in asphalt mixing plants, boilers, dryers (such as brick kilns), grain, metallurgy, chemical industries, and other industries.
Detailed Photos
The composition of the asphalt mixing plantComposition of RMII series pulverized coal combustion device:
The pulverized coal-burning device is made up of a coal burner, coal canal, coal machine, screw conveyor, coal-fired storage, oil supply device, and operating system. The coal could be crushed by the coal machine, and sprayed into the coal burner, then will be burning by electron burning torch and oil.
Product Parameters
No. | Models | Components | Total power kW | Dimension | Match t/h For asphalt plant |
burner | Coal crusher | Oil supply device | Coal storage silo | Screw conveyor |
Rated coal consumption kg/h | power kW | qty | Power kW | qty | cubage m3 | type | Loading height | power kW | qty |
1 | RMII3000 | 3000 | 2x55 | 2 | 0.75 | 1 | 4 | double | 2.9m | 2x1.5 | 2 | 134 | 10.2x4x3.7 | 210-240 |
2 | RMII2000 | 2000 | 2x45 | 2 | 0.75 | 1 | 4 | double | 2.9 m | 2x1.5 | 2 | 114 | 10.2x4x3.6 | 140-200 |
3 | RMII1500 | 1500 | 55 | 1 | 0.75 | 1 | 4 | single | 2.9 m | 1x1.5 | 1 | 68 | 9.9x3.2x3.6 | 110-130 |
4 | RMII1000 | 1000 | 45 | 1 | 0.75 | 1 | 4 | single | 2.9 m | 1x1.5 | 1 | 58 | 9.9x3.2x3.4 | 70-105 |
5 | RMII600 | 600 | 30 | 1 | 0.75 | 1 | - | hopper | - | 1x1.5 | 1 | 40 | 7.5x1.6x2.6 | 50-60 |
6 | RMII400 | 400 | 22 | 1 | 0.75 | 1 | - | hopper | - | 1x1.5 | 1 | 32 | 7.5x1.6x2.6 | 30-40 |
Five main salient feature compared with other common coal burning system:
1. Mechanized coaling:Loader coaling, lower labour intensity.
2. Automatic rotation : enhance the fireproof material service life.
3. Automatic walking: the burner can be moving by the motor drive at the stand.
4. Automatic ignition: There is a electron ignition device which can ignite automatic safely.
5. Automatic temperature self-control: It adopts temperature regulation meter trailing the medium temperature and adjusting coal supply capacity in order to guarantee the medium temperature requirement.
Pulverized coal burning device Main function and characteristic
Good adjustability for the blaze shape.
The different proportion of the burner wind inside and outside and the export jet stream type can adjust the air volume stepless, so that it could get the suitable flame shape in any working condition.
Combustion fully,energy saving
The coal burning system can effectively reduce coal consumption because
Bating harmful gas emission actively
There is a high temperature flue gas back-flow forming negative pressure district in the head of the coal burning system when it working, which can ignite powder coal quickly and make the temperature curve which follow the cylinder changes smoothly. Bating harmful gas emission actively.
Reasonable structure and good performance and characteristic overall
Good appearance, complete mating facilities, small resistance, frame adjustment flexibly and quickly.
New technology and material make it long working life.
We use the special wear resistant material or heat treatment technology for the common abrading section of the coal burning system, which make the wearing life of the burner's key position improve 5-10 times. The head and sprayer of the burner adopt wear resistant steel material,so that it has a long service life even under the condition of 1100ºC.
Equipped with fuel supply device
The oil supply adjust easily,and there is a special nozzle structure on the burning torch which has good atomization and ignition easily.High voltage spark ignition device,provide a key ignition, high ignition success rate.
Control pollution
Because the pulverized coal is fully burned and the harmful gas emission is small, the combustion tail gas passes through the dust collector, effectively controlling environmental pollution.
Cost savings
Due to high fuel price, it is significantly lower the price of the coal. This can save a larger cost for users and make the users earn cost in a large project in the same year.
Coal burner Competitive advantage
1. Main configuration
Fireproofing material:high grade anti-strip made in China
Nozzle burner: special nozzle for fuel burning system
Ignition device:high energy ignition torch
Coal crusher hammer:high-strength and wear-resistant alloy
Coal pipe:high-strength and wear-resistant rubber tube or thickening metal tube
Screw conveyor: high torque frequency conversion motor
Low voltage appliance: Domestic brands,
zhengtai appliance
Control button: Siemens APT
Transducer: Emerson
Temperature control device:
Importation wear resistant hot resistance
2.The core technology
The automatic ignition device has the highly effect. It can change low-voltage into high-voltage under the control system, and use high voltage make electric spark in the head of the gun to realize ignitingfuel atomization instead of traditional mode.Conveniently, safely and reliably.
Fuzzy control theory, automatic temperature control system, high accuracy and automatic level,automatically adjust the amount of the coal supply under the heating temperature you set.Small fluctuation.
Burner internal use special patent structure make the frame stability.Combustion efficiency not less than 90%,and effectively reduce the harmful air emotion.
The coal crusher adopt unique three-level crush structure which can guarantee Coal combustion particle size,and the hammer adopt high-strength wear-resistant composite material which improve the service life 3-5 times.
Specialization make the production of the organization more reasonable.This effectively guarantee that the quality of the products and the rapid of the production.A dramatic reduction in product delivery period.
Effective and efficient after-service is the strong support for users improving the construction progress.
Economic analysis (according to material price in China)
At present, for asphalt mixing plant, to heat aggregate, most of fuel is diesel oil or heavy oil. But, with the increasing of energy source, fuel cost is becoming big expends of asphalt batch mixing plant. Therefore, most of contractor use coal as fuel instead of oil to reduce the cost. Now, we're comparing the difference between coal burner and oil burner(take RD175 as a sample)
Under standard condition, RD175 works one hour normally, capacity of 160t, heavy oil consumption is 6.5kg/ton, coal consumption is 10kgs/ton, the price of heavy oil is RMB3,300/ton, for coal is RMB950/ton, power price is RMB1.15/degree.
Oil burner adopts Italy : drawing fan power: 37kw; oil pump: 2.2kw; oil heater: 30kw. Air compressor: 15kw.
Coal burner adopts Roady RMII2000-00, coal crusher: 2x45kw;coal screw: 2x1.5kw(frequency timing); burning power: 19.4kw; oil supply: 1.5kw; vibrator power: 0.25kw;
When using oil burner: power consumption: 84.2kw/h
Cost on power: 84.2x1.15=96.83
Oil consumption: 160x6.5=1040kgs
Cost of oil: 3300x1.04=3432
At this condition, burning system cost is:
96.83+3432=3529/h
When using coal burner, power consumption: 113kw/h
Cost of power: 113x1.15=130
Coal consumption: 160x10=1600kgs
Cost of coal: 950x1.6=1520
At this condition, burning system cost:
130+1520=1650/h
By comparison, we are easily find that the cost of RD175 working one hour, cost of using coal is 1779(3529-1650=1779) less than using oil, then will save around 20,000 per day. Therefore, by adopting coal burner can reduce the cost greatly and bring more benefit to customers. In summary, Roady RM series coal burner is wisdom choose for customer to reduce cost.
Certifications
Packaging & Shipping
Company Profile
Henan Daynn Road Machinery Co., Ltd. is located in Longsheng Industrial Park, Nanyang City, Henan Province. Covers an area of more than 160 acres and has a workshop of more than 30,000 square meters. It was put into use in 2003 and has become a base for foreign cooperation and product export.
Daynn has passed ISO9001 international quality system certification. It is a high-tech enterprise in Henan Province, an advanced enterprise in reemployment in Henan Province, and a key protected enterprise in Nanyang City.
With the rapid development of highway construction and the increasingly stringent requirements on the quality of high-grade highways, the role of large-scale complete construction equipment and complete maintenance equipment for high-grade highways is becoming increasingly important in highway construction. With its strong scientific research and development capabilities and a complete marketing and service network, Daynn Company is setting sail in the field of road construction machinery manufacturing, showing its glory and creating greater brilliance!
Factory Area
Office
Our Advantages
Comparison item | Other Machinery | Daynn Machinery |
Process flow | The manufacturing is rough and the quality is not guaranteed. | Fine workmanship, guaranteed quality, beautiful appearance and smart |
Standard total power | The standard total power is high, the energy consumption is large, and the cost is high. | Large motors adopt reasonable step-down start, energy saving, consumption reduction, and environmental protection |
Cold aggregate supply system | 1. The cold storage bin has a small storage capacity and requires frequent loading by the loader. 2. The anti-arch and arch-breaking effect is poor, and the material is easy to block. | 1. Modular, integrated grading system, frequency conversion speed regulation, smooth material distribution, no jams, stagnation, and obstruction. 2. There is a replaceable hoarding on the feeding bin, and the capacity can be expanded according to construction needs. 3. The middle filter screen adopts a self-vibrating forced screening type, which effectively removes super-large aggregates and debris |
Drying drum system | The drying drum has no core technology, slow heating, large heat loss, and is easy to float and jump. | 1. The patented technology of the heating zone of the drying drum, the complete set of lifting blades made of special wear-resistant materials, and the unique welding structure and layout make the heating of the mixture more uniform and rapid, and the utilization of thermal efficiency higher. 2. The internal board of the drying drum adopts a patented structure, which has high heat utilization 3. The drying drum has a precise transmission and is not easy to slip, which completely overcomes the drum vibration. |
Burning system | Without core technology, purchasing other brands, the overall energy consumption under standard conditions is too large. | 1. The internal spiral blades near the burner flame are installed in reverse, unique technology, reducing heat loss 2. The pulverized coal combustion device with independent intellectual property rights can save energy for you and is your first choice for reducing production costs. |
Hot aggregate lifting system | Chain structure, easy to break, low lifting efficiency, easy to jam, short life cycle | 1. The design lifting capacity of the aggregate hoist is higher than the standards of similar products of other manufacturers 2. Double-row plate chain structure, high strength, not easy to break |
Vibrating screen system | The eccentric wheel vibrates, the noise is large, the mixing plant is easy to shake, and the screening efficiency is low | 1. Upper vibration structure, dual-axis linear excitation source, compact structure, strong vibration force, good screening effect, low mixing rate, high efficiency, and low noise. 2. The inner bearing of the vibrating screen is used Japanese-made bearings, which are resistant to high temperature, anti-vibration, low noise, and long life. |
Mixing tower system | Long mixing cycle, uneven mixing, easy to spatter, short life of wearing parts | 1. Double-horizontal shafts synchronously drive the mixer to realize large-circulation and three-dimensional mixing, which is rapid, uniform, and efficient 2. The mixing liner, mixing arm, and mixing blade is made of high-strength anti-wear special alloy castings. The service life and performance exceed industry standards. 3. Large-open door unloading mechanism, short unloading time, no dead zone, and less heat loss |
Control system | If a single business computer control system fails, it will cause major losses. | 1. Advanced TCS control system, easy operation 2. Use Omron's latest powerful PLC programmable controller to make the control system run stably and reliably. 3. It can store 200 formulas and call, store, and print various data reports at any time. |
FAQ
- 1. Which countries have your equipment been exported to?
- Malaysia, Thailand, Indonesia, India, Myanmar, Bangladesh, Outer Mongolia, Iraq, Russia, Kyrgyzstan, Kazakhstan, Uzbekistan, Russia, Lebanon, Albania, Nigeria, Chile, etc.
- 2. What is the fuel consumption for producing one ton of thermally mixed finished materials?
- Diesel ≤6.5 kg
- 3. How many workers are required to operate a set of asphalt mixing plants?
- 1 manager, 1-2 operators, 1-2 loader operators, 1 fitter, 1 electrician, 2-3 common workers.
- 4. How many days does it take to install a set of asphalt mixing plants?
- According to local conditions, normally about 15-30 days.
- 5. Do you provide overseas installation and training services?
- Yes, we can send experienced engineers to your country to guide the installation and commissioning, and train your workers on how to operate and maintain the plant, and we can also arrange for personnel to visit our factory on a regular basis.
- 6. How long is the delivery time?
- According to different configurations, we guarantee delivery on time 20-35 days after the deposit arrives.
- 7. Can you send me some parts for free?
- We will supply some common spare parts for free along with the equipment
- 8. How to get to your factory easily?
- Our city has an airport. If you take a plane, you can take off from Guangzhou/Beijing/Shanghai to Nanyang city within 2 hours. You can also fly to Zhengzhou to take the high-speed rail to our city or we will send a car to pick you up.
- 9. Can I visit your factory?
- Of course. We warmly welcome you to visit our factory. We will provide you with five-star quality service.
- 10. How long is the warranty period of your asphalt equipment?
- 12 months after shipment or 2000 working hours, whichever occurs first.
- 11. What payment terms do you accept?
- According to the actual situation, we accept multiple methods such as wire transfer, letter of credit, document against acceptance, document against payment, Western Union, MoneyGram, etc.
- 12. What certificates are available in Machinery?
- For the certificate, we have CE, ISO, Gost, EPA(USA)CCC.
- 13. What about the Minimum Order Quantity?
- The MOQ is 1 pcs.